Projects (as Main Contractor)
New Built Works Construction:
Residential Building, No. 4 Kent Road, Kowloon Tong
Residential Building, No. 147 Waterloo Road, Kowloon Tong
Composite Development at No.245-247,Tai Kok Tsui
Commercial Building, 40 Kimberley Road, Tsim Sha Tsui
Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin
Seng Tak Central School Building Project, New Clear Water Road, Kowloon
Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12, Yuen Long Pau Cheung Square, Yuen Long
Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon
Redecoration Work
Kau To Shan and Hong Lok Yuen South Bay,
和明以主承建商的身份完成了
1.
2.香港觀塘新清水灣道重置香港扶幼會盛德中心學校建築工程(整(zhěng)單所有項目)
3.香(xiāng)港沙田嶺道(dào)11號(hào)住(zhù)宅建(jiàn)築工程
4.沙田火炭數據中(zhōng)心工程(機電設備連(lián)裝修)
5.九肚山以及康樂園南灣(wān)、壽臣山、加列山等豪宅裝修等
6.
7.九(jiǔ)龍塘根(gēn)德(dé)道
8.九龍塘窩打老道(dào)147號單幢式住宅
9.尖沙(shā)咀加連威(wēi)老道(dào)24A&24B大廈
10.元朗(lǎng)炮仗坊 8-12號
11.旺角上(shàng)海街445
Projects (as Sub Contractor)
Civil Engineering:
Hong Kong's Siu Sai Wan Park Drainage Project,
Government Development Department's Tin Shui Wai Wooden Bridge Project,
Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.
Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.
A&A Works Construction:
The renovation project of Sha
Steel Structure Engineering
Design and manufacture of installation works:
Mobile safety fence in the Wan Chai - Central Phase II reclamation works.